how to install a second floor deck

flashing a deck ledger board properly - how to

next you’ll want to install a piece of metal drip cap flashing above the ledger board. when you install the floor joists you’ll need to make some small cuts in the flashing to allow the top of the joist to line up with the top of the ledger board. make sure the house wrap is long enough to cover over the top of the drip cap.【Get Price】

lateral bracing for a second-story deck | professional.

lateral bracing for a second-story deck. in this situation we typically would install what in my article i call “house-frame brackets” which are custom-fabricated 1/4-inch-thick by 3-inch-wide galvanized steel l-brackets with 9-inch-long legs (see photo left). the brackets should be installed horizontally rather than vertically...【Get Price】

backyard decks: build an island deck | family handyman

frame the steps for the floating deck next. you can avoid additional footings by hanging stringers from the deck joists with metal angles or 2x4s. the deck surface should be no more than 8 in. above the ground where you step up on it. if it’s close just build up the ground or add concrete pavers. otherwise add a step.【Get Price】

how to install porch flooring | how-tos | diy

install the decking. the decking boards are installed to run perpendicular to the house (image 2). cut the boards allowing at least a 3-inch overhang. this will be trimmed off after the porch decking is finally installed. use a flooring nailer to install the porch deck board (images 3 and 4).【Get Price】

pouring second-story concrete flooring | doityourself.com

mark the walls surrounding the floor at the predetermined height of the floor. your forms should help with this but marking the wall makes for a more accurate finished product. let the cement roll in off the truck and prepare for the finishing. step 4 - finish the floor. finishing the floor can be a long and tedious process.【Get Price】

second story balcony additions - modernize

second story balcony additions. but on a practical level they can increase your outdoor living space for less than the cost of ground-floor deck. if you’re considering adding a balcony to your second story you’ll want to select the best design materials and contractor for your budget and your goals. here are a few things to think about as you start this fun project.【Get Price】

how to build handrails for second-floor deck stairs

wait a second... the existing handrail still didn't have a newel post to provide support at the end of the railing. i cut a square hole (using a drill and a reciprocating saw) in the deck board right at the corner where the nearest deck joist intersected the rim joist.【Get Price】

how to keep second floor deck from dripping water onto.

how to keep second floor deck from dripping water onto first floor deck we are planning to build a second floor deck over an existing deck. will be 16 x 12 when finished.【Get Price】

how to easily make the underside of a raised deck waterproof

firstly you need to purchase a continuous sheet of epdm to cover the entire deck area which you then lay on top of your existing deck to provide a durable long-lasting waterproof membrane. epdm is available in widths up to about 50′ so you can generally lay down a continuous sheet without any seams.【Get Price】

how to build tall outdoor stairs for a high 2nd-story deck.

the tops of the stringers will be fastened to the sides of these blocks. the holes for the lower handrail posts were dug. the outer stringers were set in place against the top fastening blocks. i clamped the top of the stringer to the 2x8 block and drove in a few 3" deck screws.【Get Price】

how to build a deck: wood decking and railings - lowes.com

continue installing the posts. along the rim joist for posts next to floor joists you can attach a piece of bracing with nails to secure the anchor so it doesn't interfere with the joist hanger. the bracing should be of the same 2 x material you used for the joists (in this case 2 x 8 lumber) and at least 16 inches in length.【Get Price】

top 10 deck-building mistakes - fine homebuilding

overspanning composite decking is most commonly a problem when deck boards are run diagonally over joists or when they’re used as stair treads. the solution: floor joists for a deck are typically installed at 16 in. on center which won’t properly support some composite-decking products when installed on an angle. in new construction be sure floor joists are installed at the correct spacing.【Get Price】

attaching a ledger board for your deck | decks.com

1. carefully determine the height for the ledger—which will also be the height for all the joist framing. the top of the ledger board should be lower than the desired top of the finished deck by one decking board’s thickness plus the thickness of the flashing (usually 1/8 inch). the finished deck height is 1 inch below the bottom of the sill.【Get Price】

how to install tile on a second floor | hunker

how to install tile on a second floor step 1. locate a pipe that goes through the floor. step 2. purchase enough cement backerboard to make your floor at least 1-1/4-inch thick; step 3. cut cement backerboard to fit by scoring it with a carbide-tipped cement board knife... step 4. lift each.【Get Price】

how to build an elevated second floor deck | hubpages

step by step how to build an elevated deck. they have to be 3/8 x 8” long carriage bolts. 6. after all the outside plates are installed then go ahead and install the rest of the joist hangers. i also like to double up the outside plates for the extra strength. i use # 10 galvanized nails and nail 3 nail every 16”.【Get Price】

framing high decks | diy deck plans

framing high decks. instead of 4x4 support posts 6x6 posts may be called for. footings for these larger posts are typically larger and may need to be deeper. joist sizing and spacing may change. fastener types and frequency may change. allowance for the installation of safety rails becomes a greater concern. these changes are not major.【Get Price】

second-story balconies - fine homebuilding

builders with clients who request a second floor balcony have to figure out durable details that will support people and railings. for years some designers have created second-floor balconies by cantilevering floor joists (or a floor slab) through the thermal envelope of the building. however there are two serious problems that are associated with following this practice: thermal bridging and moisture management.【Get Price】

wood porch with a tile deck | professional deck builder

a membrane installed between the tile and the substrate helps waterproof the assembly and keeps the tile from cracking. because the smaller tile was 6 inches wide the layout had to be executed in 6-inch increments. so if i needed to shift the reference point over the amount of that shift would be 3 inches.【Get Price】

adding a second story deck to your home | doityourself.com

when designing your deck you might consider an egress from the second story. if there is an existing window on the second floor that could be replaced with a exterior door all the better. an existing window if wide enough to accommodate a doorway will provide you with the structural header already in place and make the modification to a doorway easier and less expensive.【Get Price】

how to install tile on a second floor | hunker

when you are installing tile on a second floor you may be concerned that the floor isn't strong enough to support the weight of tiles and mortar. however you can strengthen the subfloor with a layer of cement backerboard and then install tile on the floor as you would with any other tiling project.【Get Price】

how to tile an exterior deck | home guides | sf gate

install the first row of tiles in the order they were laid out starting at the center of the chalk lines. place a level on top of the tiles after each two or three you install to ensure they are.【Get Price】

how to install deck joists - homedit.com

how to install deck joists. in this instance we’ll first need to level the footing post to be even with the joist tops. grab your reciprocating saw with a blade that’s long enough to get through the post at an angle. at the precise level of the top of the beam/frame use the reciprocating saw to lop off the post top.【Get Price】

attaching stairs to a deck - methods and tips - decksgo.com

attaching stairs to a deck. the final stage in building your deck is likely going to be when you connect the stairs to the deck. every set of stairs has to be connected to the deck somehow. it is not always done the same way. here are the various ways in which you can attach them and it is dependent on joist direction or the style of the stairs.【Get Price】

how to build a simple deck | diy deck building | this old.

lay a straight deck board in the adhesive so its long edge overhangs the trim board by 1 inch. secure each end of the deck board with an 8d finish nail. tack 8d finish nails into the joists alongside the first board to maintain consistent spacing. squeeze dabs of adhesive onto the top edge of each joist. lay and nail the next deck board as before.【Get Price】

how to build a deck on the 2nd story of your house | hunker

step 3. build the frame of the deck on the ground by bolting four boards into a square or rectangle the size of the projected deck. install crosspieces throughout the frame every two feet to insure a strong base on which to lay your flooring. using volunteers or a small crane hoist the boxed in frame on top of your support posts...【Get Price】